- JMD-EVNAT Fabrication: In-house production of the custom equipment components in strict compliance with the Detailed Engineering Documentation (DED) and CFD simulation results.
- Procurement & Sourcing: Selection, purchasing, and verification of standard off-the-shelf equipment integrated into the system (pressure and temperature transmitters, controllers, control panels, and cabling).
- Quality Assurance & Factory Acceptance Testing (FAT): Functional verification of all components at the manufacturing facility, along with bench testing of the assembled units.
- Logistics & Site Delivery: Ensuring the timely delivery of equipment to the installation site, strictly adhering to all handling, transportation, and storage requirements